Bi-Monthly Journal
This is a bi-monthly updated blog tracking Chase's progress throughout the completion of his project.
Summary of WorkDuring the second half of December, I have worked on some general planning parts of the project as prep for the in-lab portion of the project. I have been working on designing a bioreactor that should work, as per the specifications of my SOP. However, I still need to do more research before I finalize the design and buy parts. I also have finalized the gene vector sequence, which is detailed below. This vector will allow for me to make the E. coli produce the proteins I want. Gene Vector SequenceBelow is the rHb0.0 Vector that will work best for the project. Looking ForwardLooking forward, I need to finalize the bioreactor design, and order the gene vector. I am hoping to do both of these before the end of January.
1 Comment
|